H-Man Electrical CRM
Second vertical CRM fork: TDLR contractor enrichment + live dispatch board.
Second vertical proof-point for the verticalization playbook; demonstrates repeatability across distinct trades.
H-Man Electrical runs a contractor-enrichment pipeline driven by TDLR (TX Dept of Licensing & Regulation) license lookups, feeding a live dispatch board for the field crew. Modes include tdlr-load, tier0, tier1, push, and all (`/home/will/permit-api-live/scripts/contractor_enrich.py`).
Deploys are frozen since 2026-04-10 because the GitHub webhook is missing on wburns02/HManElectrical. 8 commits are queued (including the Live Wire redesign). Webhook reconnect is the only remaining gate.
- > TDLR contractor enrichment live
- > Live dispatch board
- → Fix Railway webhook → ship 8 queued commits
- → Activate Live Wire redesign
- → Push lead delivery integration